Shift work at the Yamal LNG project in Sabetta. Its vacancies are posted on the official website. In-demand professions for men and women are driver, technician, mechanic, welder, installer, electrician, commandant, cook, etc. In 2019, Yamal LNG OJSC annually plans to commission one production line of a liquefied gas plant, therefore The question, Yamal LNG - vacancies, is very relevant at the moment.

Shift work and vacancies Yamal LNG in the rotational camp. Feedback from employees about working in the North. How to get a job on Sabetta's shift. Contacts of the HR department of the direct employer. Are there any vacancies for women? Professions: handyman, driver, electrician. Vacancies for YAMAL LNG for shift work for 2019 at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. You can find out how to get a job in a company and what kind of work they offer in the North on the official website. And also on specialized resources for posting vacancies.

Fill out your resume ➤

Contacts of the HR department for employment, telephone number, current vacancies are available on the official website of Yamal LNG http://yamallng.ru/career/open_vacancies/ - select an open vacancy from the list and on this page there will be a button “send a ready-made resume”. The text and vacancies posted below are for informational purposes only.

Work on Yamal LNG on a rotational basis

The company pursues personnel and social policies in compliance with the strictest and highest world standards. Yamal LNG – vacancies for representatives of various specialties; workers from different countries take part in the implementation of the project.

Fill out your resume ➤

In addition to the construction of the plant, a modern airport for international traffic and a seaport, as well as other transport infrastructure facilities, are being built. The construction of the plant is carried out in several stages, the launch of which is planned in 2019-2019. Up to 16 million tons of LNG will be supplied annually to European and Asia-Pacific countries; in addition, up to 1.2 million tons of gas condensate will be sold.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with a full social package, medical insurance, and there is the opportunity to take advantage of health resorts. The company is actively developing, so there is a constant need for qualified workers in various specialties.

Today, there is a large selection of vacancies, and you can apply for the one that matches your education and work experience. The most current vacancies: managers, IT specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers in various fields of work, process plant operators.

Yamal LNG – vacancies for specialists of various specialties. The main advantages that allow the company to successfully compete in the modern market:

  • deposits are located on land and are highly concentrated;
  • development technologies are well developed;
  • studied geology;
  • a minimum of funds is spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and other government support.

Many vacancies require people with experience in similar work, but there are also those who accept people without work experience, for example, general workers, drivers of various categories of driving, and there are vacancies for women.

Jobs in gas production in Yamal

It is planned to produce gas from 208 wells; it will be supplied to the market in liquefied form, therefore, starting in 2017, three technological lines will be commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

A shipping rack with two berths is being installed in the port of Sabetta. Now the cargo berths are already operational, so the delivery of building materials is carried out continuously throughout the year. This project involves the construction of the largest LNG production plant in Russia.

This is the largest enterprise on the Yamal Peninsula, which provides people in this region with highly paid jobs, the average salary is 120,000 rubles. Yamal LNG – vacancies for rotational work. Usually the shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to temporarily leave your family, your usual life and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will remain relevant for a long time.

Shift in Sabetta with accommodation

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, rest and leisure of workers. There are cozy dining rooms, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry room, living quarters, a warm parking lot, and a new canteen are currently being built, so current vacancies are appearing. More than 15,000 people are already employed in the implementation of this project, and if you hurry, you can soon join them.

Feedback from employees about working in the North

The project involves the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the South Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards amount to 926 billion cubic meters. m. As part of the Project, a transport infrastructure is being created, including a seaport and an international class airport in Sabetta.

Fresh selection of Yamal LNG vacancies for today

Welding engineer category 1

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Technical supervision, carrying out and coordinating work to determine compliance with the established requirements of the welding work performed and the object (welded structure) during construction...
…enterprises in the oil and gas, oil refining industries and/or LNG production enterprises. Knowledge of welding methods: RD, RAD. MP, MPG, AF, AAD.

Chemical engineer / Chemist engineer


Carrying out the full range of analyzes offered by the chemical analysis laboratory, including the distribution of tasks among laboratory staff. Preparing the laboratory for accreditation...
Higher education in chemistry and chemical technology. The following courses are preferred: chemistry course for the oil and gas industry, laboratory analysis courses...

Electrical engineer (category 1)/supervisor (energy supply area)

OJSC Yamal LNG Sabetta (Yamalo-Nenets Autonomous Okrug)
Control and supervision of compliance with current legislation, regulations, requirements of administrative and regulatory documents for the technical condition of electrical installations: PS...
Higher professional education (electricity / energy). Experience: at least 3 years of work in a similar position. English is fluent.

Leading Energy Engineer, Energy Supply Section

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Implementation of organizational and technical support for the full cycle or individual stages of operation of electrical installations: substation 35/10(6) kV, ZRU-10(6…
Higher professional education (electricity / energy). Experience in the specialty: at least 3 years of experience in a similar position.

IT trainee specialist (technical support)

OJSC Yamal LNG
Moscow, Vernadskogo Avenue and 2 more CAREER.RU
Assembling, installing and upgrading PCs. Diagnostics of hardware and software in order to detect faults. PC hardware repair by replacing faulty…
Knowledge of PC hardware and peripherals. Knowledge of Windows XP / Vista / 7 OS. Knowledge of basic network protocols and services.

Chemical analysis laboratory assistant

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Carrying out timely sampling in strict accordance with regulatory and technical documentation and sampling schedule. Conducting routine analysis of gas samples, gas...
Higher or secondary specialized education in the field of chemistry and chemical technology or secondary specialized education, possession of a 4th/5th laboratory technician certificate...

Wastewater treatment plant operator / chemical water treatment operator (water treatment plant, 3rd category)

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Carrying out start-up and shutdown of water treatment facilities, guided by the instructions of the senior control panel operator. Ensuring the safe operation of process equipment and pipelines.
Secondary specialized or higher education, preferably with a specialization in health and sciences. Availability of a qualification certificate for a wastewater treatment plant operator / wastewater treatment operator / operator…

Welding master

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Production of welded structures (products, products: metal structures, pipelines, equipment) in accordance with established quality requirements. Analysis of the plan/schedule for the production of welded…
Secondary vocational education. Experience in certification of welding equipment and technologies. Experience in managing a team (team) of welders when performing welding (construction, repair) responsible...

Leading specialist of the information systems support group (Sabetta, Yamal-Nenets Autonomous Okrug)

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Administration, optimization of the company's information systems (EDS Directum, 1C, Drilling Monitoring, project management systems). Administration of DBMS MS SQL 2008…
Higher technical education. Practical experience: — Installation, configuration, administration, optimization of configurations based on 1C: Enterprise 8.2, 8.3…

MECHANICAL ASSEMBLY WORKER

responsibilities:

Execution of production tasks received from the mechanic repair shop foreman for equipment repair and post-repair testing;
Installation, configuration, diagnostics (troubleshooting), repair and maintenance of mechanical equipment (various types of pumps, valves, gate valves, etc.);
Providing daily reports on work performed, participating in safety meetings and informing the supervisor of any malfunctions or deviations;
Compliance with work permit requirements;
Assistance in preparing work permits;
Obtaining from the warehouse the spare parts necessary to perform the work;

requirements:

Secondary special education;
Having a Mechanical Assembly Mechanic certificate (minimum 3 categories) is required;
5 years of experience as a repair technician in a workshop and in the field at oil, gas and petrochemical industry enterprises;
Experience with systems for issuing work permits;
Skills in identifying the necessary spare parts for repair/restoration work and experience in drawing up and placing applications for them;
Required: experience in inspection and repair of shut-off and control valves (namely: ball and plug valves, gate valves, valves, spring and pulse safety valves (pilot), control valves, check valves, etc.);
Experience with mechanical and hydraulic systems;
Proven skills in using hand and special tools (centering, tightening, mounting and disassembling flange connections, working with pipelines and flexible pipes).

HEATING NETWORKS MAINTENANCE WORKMAN

The construction of the liquefied natural gas plant is carried out in three stages with the launch in 2017, 2019 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate for supplies to the markets of the Asia-Pacific region and Europe.
The project is being implemented by Yamal LNG OJSC, whose shareholders are the largest companies in the field of production and processing of hydrocarbons: NOVATEK OJSC - 60%, Total - 20%, CNPC - 20%.

Personnel policy

OJSC Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is being implemented by representatives of various nationalities and states. A common goal and a strong team are the main conditions for the successful implementation of the Project. The company creates comfortable and safe working conditions, takes care of the social security of employees, providing compensation, voluntary medical insurance, and the possibility of sanatorium-resort rehabilitation and recreation.

Fill out your resume ➤

OJSC "YAMAL LNG" is an actively developing company interested in cooperation with highly qualified specialists.

Job vacancies on Sabetta

Moscow (5)
MANAGER OF INVESTMENT PLANNING AND FINANCIAL ANALYSIS DEPARTMENT (DECRETARY RATE)
CHIEF SPECIALIST, INFORMATION TECHNOLOGY DEPARTMENT (MOSCOW)
ENGINEER OF 1 CATEGORY
HVAC Engineer
CHIEF SPECIALIST OF FINANCIAL AND ECONOMIC DEPARTMENT
Sabetta/LNG Plant (46)
________________________________________
DEPUTY HEAD OF CORROSION GROUP
HEAD OF COMMON FACILITIES SECTION
DEPUTY MANAGER OF ELECTRICAL EQUIPMENT GROUP FOR GENERAL FACILITIES, POWER PLANT, STORAGE AND SHIPPING OF FINISHED PRODUCTS
SENIOR ELECTRICAL ENGINEER (PROCESS LINES SECTION)
ENGINEER 1 CATEGORY (EQUIPMENT OVERHAUL GROUP)
Mechanical engineer 1st category (designer)
Senior Civil & Structural Engineer
EQUIPMENT MAINTENANCE AND PPR PLANNING ENGINEER
CONDITION MONITORING ENGINEER
REPAIR ENGINEER 1 CATEGORY PRODUCTION AND TECHNICAL DEPARTMENT
PROJECT ENGINEER 2 CATEGORY / JUNIOR PROJECT ENGINEER
CHEMICAL ENGINEER
ENGINEER 2 CATEGORY (JUNIOR SHUTDOWN ENGINEER)
TECHNOLOGIST ENGINEER 1 CATEGORY / PROCESS CONTROL TECHNOLOGIST
SENIOR ELECTRICAL ENGINEER (GENERAL PLANT FACILITIES)
ENGINEER-INSPECTOR 1 CATEGORY
ENGINEER-INSPECTOR 2 CATEGORY
ENGINEER 1 CATEGORY FOR DEVELOPMENT OF PROCEDURES FOR MAIN PRODUCTION SYSTEMS AND INSTALLATIONS OF THE TECHNOLOGICAL LINE SECTION
ENGINEER 1 CATEGORY HVAC ENGINEER
CONSTRUCTION ENGINEER
TECHNOLOGIST ENGINEER 2 CATEGORIES
PROJECT ENGINEER
TECHNOLOGICAL EQUIPMENT REPAIR MASTER
ENGINEER FOR GENERAL CONSTRUCTION WORKS AND STRUCTURES
OPERATOR OF TECHNOLOGICAL INSTALLATIONS 7 DISCHARGE LNG PLANT PROCESS LINES SECTION
Head of estimate and contract department / Head of project service & control
CHEMICAL ANALYSIS LABORATORIST 4-5 CLASS
ENGINEER 2 CATEGORY (VIBRATION MONITORING AND CONTROL GROUP) / JR. CONDITION MONITORING ENGINEER
OPERATOR OF TECHNOLOGICAL INSTALLATIONS (CENTRAL CONTROL PANEL) OF THE ENTRANCE STRUCTURES SITE
HEAD OF METROLOGIST GROUP
CATEGORY 1 NDT ENGINEER / NDT ENGINEER
CATEGORY 1 ENGINEER IN PRODUCTION PLANNING
DEPUTY PROJECT ENGINEERING MANAGER
TECHNICAL ASSISTANT
SENIOR INSTRUMENT ENGINEER
Operational readiness engineer / OR&A engineer
CONTROL SYSTEM AND DIAGNOSTICS EQUIPMENT TECHNICAL CONDITION ENGINEER
CORROSION ENGINEER 2 CATEGORY
OPERATOR OF TECHNOLOGICAL INSTALLATIONS 8 DIAGRAM LNG PLANT, PROCESS LINES SECTION
ELECTRICAL ENGINEER 1 CATEGORY
HEAD OF METROLOGY LABORATORY, DEPARTMENT OF ICS AND INSTRUMENTATION
Pre-Project Preparation Project Engineer / Front End Project Engineer
SENIOR LABORATORIST CHEMICAL ANALYSIS
ENGINEER 2 CATEGORY (ROTING EQUIPMENT) / JR. ROTATING EQUIPMENT SPECIALIST
ENGINEER 1 CATEGORY (OR&A ENGINEER)
Sabetta - .
________________________________________
SPECIALIST OF THE TECHNICAL DOCUMENTATION CONTROL DEPARTMENT (SHIFT 30/30)
TRANSLATOR
HEAD OF ENVIRONMENTAL PROTECTION SERVICE
CHIEF SPECIALIST OF INFORMATION SECURITY DEPARTMENT (SABETTA)
DEPUTY HEAD OF ENVIRONMENTAL PROTECTION SERVICE
Electrician 3-4 categories
Locksmith - machine operator

Yamal LNG is an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional reserves of high concentration located on land
well-studied geology and proven development technologies
very low development and production costs
High efficiency of the liquefaction process due to low average annual temperature
access to markets in Europe and the Asia-Pacific region
government support, including tax benefits

Project infrastructure

The field development project involves drilling 208 wells at 19 well pads. Gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of a loading rack with two berths in the port of Sabetta, equipped with ice protection structures. Reinforced ice class Arc7 tankers will be used to transport LNG.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is planned for 2017.
Major tenders have been completed and key contracts have been concluded for the supply of materials and equipment and the provision of design and construction services. More than 95% of the LNG plant's products have been contracted. The operation of cargo berths in the port of Sabetta has begun, ensuring year-round delivery of construction cargo. Development drilling and construction and installation work are underway at the LNG plant facilities. At the end of 2016, the project was approximately 75% complete.

As part of the YAMAL LNG project, it is planned to build the country's largest LNG (liquefied natural gas) processing and production plant, capable of developing a capacity of about 16,500,000 tons annually based on the resources of the South Tambeyskoye field.
According to PRMS standards, the proven and probable reserves of the gas field are approximately 900 billion cubic meters. This project involves the implementation of communication routes:
sea ​​port,
motor transport structure,
modern Sabetta airport.

Work at Yamal LNG

The company OJSC Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This venture is a joint venture, where the management stake belongs to OJSC NOVATEK, TOTAL, CNPC and the Silk Road Fund are involved.
Salaries in Yamal LNG start from 120,000 rubles.

This structure involves a large number of jobs for. This direction is widely in demand among job seekers who are ready to break away from their usual life and move into hard work conditions for a period of one month or more. The shift schedule is mainly structured as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
Construction of the plant is planned in three stages:
2017
2019
2019
Accordingly, current vacancies in the project will appear for a long time. Direct employers are ready to offer the best conditions for shift work in the gas production industry.
The Yamal LNG plant is being established above the Arctic Circle on the northern Yamal Peninsula, on the site of the South Tambey natural gas field. Construction is successfully carried out in 3 stages in 2017, 2019 and 2019. The natural gas processing project plans to annually produce 16.5 million tons of liquefied gas and up to 1.2 million tons of gas condensate for the Asia-Pacific and European markets. Job openings at the Yamal LNG plant will be available below.

Yamal LNG - Job search on a rotational basis: latest vacancies

Today, the rotational method is becoming more and more attractive for many job seekers due to the high salaries offered and trips to different regions of the country. Thus, vacancies at Yamal LNG are of interest to many specialists due to the opportunity to consistently receive a good salary, new experience and build a successful career.

To get acquainted with such job offers, it is proposed to take advantage of the extensive opportunities available to users on the World Wide Web on a website dedicated to employment. Lots of new ads are constantly being added here. Each of them indicates basic information on a specific specialty that interests applicants. It makes it clear how suitable the offer is for the specialist in terms of salary, region of work, responsibilities and other aspects.
Yamal LNG Company

Yamal LNG is a gas production company. The project is aimed at the active construction of a plant intended for the production of natural liquefied gas. Within its framework, it is planned to create the necessary facilities.

The project includes the following areas for natural gas:

  1. mining;
  2. liquefaction;
  3. supplies.

The advantages include the presence of a good resource base, as well as a good location, which in combination allows you to achieve excellent results.

This is also facilitated by the work of highly qualified employees who work in various specialties, applying directly in practice the entire volume of their professional knowledge and practical skills.

Current vacancies

On the Internet today it is easy to find many job offers for companies in the following areas:

  • operator of a gas station, wastewater treatment plant;
  • laboratory assistant;
  • fuel and lubricants storekeeper;
  • instrumentation mechanic;
  • translator;
  • geologist;
  • gas cutter;
  • Lead Engineer;
  • process engineer;
  • head of a workshop, department;
  • Instructor;
  • technician;
  • finisher;
  • economist;
  • insulator;
  • head of laboratory;
  • accountant;
  • truck crane operator;
  • chemical engineer;
  • installer;
  • foreman;
  • slinger;
  • driver;
  • mason;
  • driver;
  • Chief Specialist.

From this extensive list, it becomes clear that the company requires qualified employees in many specialties. Each vacancy job at Yamal LNG has its own list of requirements for candidates and professional responsibilities.

Working conditions

The offered vacancies are of interest to job seekers due to attractive conditions. Thus, employees are provided with everything necessary and are officially registered in accordance with all relevant labor legislation.

The advantages include the offer of a high and stable salary for interesting work in a friendly team with the opportunity to gain experience, new knowledge, realize your full professional potential, as well as advanced training. Shift positions at Yamal LNG are distinguished by convenient work schedules, long vacations, and the opportunity to travel to the regions of the country.

LNG PLANT IN YAMAL

An LNG plant with a capacity of approximately 16.5 million tons is being built directly at the South Tambey gas field, on the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the project implementation schedule. This project will contain 3 natural gas liquefaction trains with a capacity of 5.5 million tons each year. The first launch is planned for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, this makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. After the plant starts up hydrocarbon production the mixture from the field's wells will be transported through gas collection networks to a single complex for gas preparation and liquefaction. Next, at the entrance of the complex there will be a separation process. The input structures include installations that regenerate methanol and stabilize condensate. The separated natural gas will go to technological lines where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Next, the purified natural gas will be sent for cooling and liquefaction. The LNG will be further stored in closed isothermal tanks. It is planned to build 4 reservoirs with a capacity of 160,000 cubic meters. m. each. Jobs at the LNG plant IN YAMAL vacancies - read on.

SABETTA VILLAGE - FOR WORKERS' ACCOMMODATION

The village of Sabetta, located on the eastern side of the Yamal Peninsula, is the stronghold of Yamal LNG. A modern infrastructure has been created here for comfortable living of workers, additional life support complexes have been built: a warehouse for fuels and lubricants, food storage warehouses, a reliable boiler room, cozy canteens, a medical center, a hotel, a public bathhouse, a sports complex, sewerage and water treatment facilities. Another canteen, a fire station, a laundry, a warm parking lot, and additional residential buildings for construction workers are being built. At the construction stage of the Project, the number of employees is already about 15,000 people. Join us too.

Open vacancies for Yamal LNG shift:

Locksmiths of various categories (3-6);
engineers of all categories;
machinists;
inspection engineers;
techniques of all directions;
specialists in entrance structures;
locksmiths of different qualifications and levels.

In addition, vacancies are often open that do not require work experience, vacancies for general workers, drivers. There are also vacancies for women on the project.
It should be noted that OJSC "YAMAL LNG" is one of the most attractive employers in the industry; international standards in social and personnel policies allow the company to offer the best working conditions on the market. A wide range of specialists from different countries are involved in the construction of the plant. A common goal and a united team are the main components for the successful completion of a project.

Specialists on a rotational basis are offered:
1. social security;
2. various compensations (accommodation, food);
3. VHI;
4. vouchers to sanatoriums and resorts to recuperate, etc.

Urgent work on a rotational basis: .

Fill out your resume ➤

Interesting VIDEO film about Yamal:

Vacancies at Yamal LNG. Shift work on Sabetta

5 (100%), Ratings: 51 Gazprom explained its claims against NOVATEK for ₽30 billion with a “letter from a scientist” ...that statements about the loss of the budget of ₽30 billion due to the project NOVATEK « Yamal LNG"were not official. These assessments were made in a scientific discussion by a member... accused the project NOVATEK « Yamal LNG“that the Russian budget was missing ₽30 billion. The company’s statement was received by RBC. Claims to NOVATEK were formulated... with " Yamal LNG» volume of Russian pipeline gas in European markets. IN NOVATEK refused to admit these accusations were true. The company emphasized that NOVATEK And... NOVATEK responded to the reproach about the budget loss of ₽30 billion due to Yamal LNG ...Russia did not receive 30 billion rubles. In NOVATEK do not believe that liquefied natural gas from the project " Yamal LNG"competes with Russian pipeline gas at..." Nikolai Kislenko critically commented on the launch of liquefied gas production at the plant " Yamal LNG» NOVATEK. « Yamal LNG"- this is the absence of an export duty, the absence of a mineral extraction tax (mineral extraction tax... The head of Russia's largest LNG plant moved to NOVATEK ... (LNG) « Yamal LNG NOVATEK, received by RBC. Kot will become the 12th member of the company's board. Among the shareholders " Yamal LNG" - first LNG-factory NOVATEK(holds... the position of manager " Yamal LNG" "Candidacy for a new General Director" Yamal LNG" will be approved by the board of directors " Yamal LNG“at the end of December 2018,” the message says NOVATEK, admitted to... Mikhelson announced Western pressure on Norway because of Russian gas Chapter NOVATEK explained that Western partners are putting pressure on Norway over the transshipment of liquefied gas from the plant “ Yamal LNG" Therefore, it is necessary to speed up the construction of a terminal in Murmansk, he indicated. NOVATEK asked to speed up the construction and commissioning of... the existing plant " Yamal LNG"in Norway became the reason for pressure on this country from Western partners. Chapter about this NOVATEK Leonid Mikhelson said... NOVATEK found gas for the third LNG plant ... good prerequisites for the successful implementation of new LNG-project,” he pointed out. NOVATEK launched the first LNG-plant in Yamal - “ Yamal LNG" - in December 2017. Its capacity... reserves are more than 926 billion cubic meters. m of gas. The first two lines " Yamal LNG"(together - 11 million tons per year) have already been launched, the third (more... gas). In May 2018, co-owner NOVATEK And " Yamal LNG» French Total agreed to purchase 10% of Arktik LNG-2" and an option for another 5...

Business, 24 Sep 2018, 11:12

NOVATEK delivered the first LNG cargo to Brazil ... . Ltd (“daughter” NOVATEK) supplied the first batch of liquefied natural gas to Brazil ( LNG), produced at the plant " Yamal LNG" This is stated in the message NOVATEK, entered... the party LNG To China. As Mikhelson noted, the total share of the two lines of the plant “ Yamal LNG» accounts for about 3.5% of the global market volume LNG. IN NOVATEK plan to produce 55–60 million tons LNG per year, third... NOVATEK doubled remuneration for board members ... the company launched the first phase of its key gas liquefaction project - “ Yamal LNG"(planned capacity - 17.4 million tons per year) - and already... ACRA Vasily Tanurkov. At the end of July it became known that NOVATEK will launch the second stage " Yamal LNG» several months ahead of schedule, and the third - earlier... 8 million tons LNG over plan. In May NOVATEK attracted the first shareholder - the French Total - to its new project "Arctic LNG-2", the launch of which... The first shipments of liquefied gas from Yamal LNG were delivered to China ...the first batches of liquefied natural gas ( LNG) With " Yamal LNG" To China. TASS reports this with reference to NOVATEK. Each tanker carried... " Yamal LNG"was launched in early December 2017. Chapter NOVATEK Leonid Mikhelson announced the launch of the second stage on July 19 “ Yamal LNG"in the first ten days of August. NOVATEK controls 50.1% " Yamal LNG", 20 each... The head of NOVATEK announced the launch of the second stage of Yamal LNG ... natural gas " Yamal LNG"will be launched in the first ten days of August. The head stated this NOVATEK Leonid Mikhelson, reports TASS. First of all " Yamal LNG"launched in... . The lot was acquired by Petronas LNG UK Limited. The gas was delivered by icebreaker LNG-tanker "Christophe de Margerie" to Britain. From there the cargo was delivered to... . After launch " Yamal LNG" profit NOVATEK increased by 16%, to 179.4 billion rubles. The Russian gas company owns 50.1% " Yamal LNG", 20 each... Timchenko announced a new joint project between Total and NOVATEK ... companies to jointly implement a gas liquefaction project " Yamal LNG" worth $27 billion. "We have built now " Yamal LNG" Where did we get the money? $27 billion investment... . That's the main thing. I always have it,” added Timchenko. " Yamal LNG» - a plant for the production of liquefied natural gas with a capacity of 16.5 million... per year (with the possibility of increasing to 17.5 million tons). Besides NOVATEK, shareholders " Yamal LNG"are French Total (20%) and Chinese CNPC (20%) and... NOVATEK reported damage to one of the Yamal LNG tankers ... tanker plant " Yamal LNG"was damaged and will temporarily suspend the supply of liquefied natural gas, Prime reports with reference to the deputy board NOVATEK Brand of Jetveya... factory « Yamal LNG"at the end of 2017 and an increase in average sales prices of liquid hydrocarbons and natural gas," the company indicated. Factory " Yamal LNG"opened... NOVATEK's revenue increased by 16% after the launch of Yamal LNG ... EBITDA is mainly related to the launch of production LNG at the first stage of the plant " Yamal LNG"at the end of 2017 and an increase in average prices... . At the annual meeting of shareholders on April 20, the chairman of the board and co-owner NOVATEK Leonid Mikhelson said that based on the results of the first quarter of 2018..., first of all, technological ones,” Mikhelson explained. Factory " Yamal LNG» began production of liquefied natural gas ( LNG) on the first production line in December 2017... The first tanker with gas from Russia for the United States continued its journey to Boston ... British Isle of Grain terminal in Kent. Representative of the company NOVATEK, at whose plant liquefied gas was produced, told RBC that... the purpose of the tanker with cargo has not changed. NOVATEK On December 5, he announced the launch of the first stage of the plant. Yamal LNG", which produces liquefied natural gas. The total capacity of the plant should exceed 16.5 million tons LNG in year. Price... The shipowner named the reason for turning around a tanker with Russian gas for the United States ...delivered to its destination. The change in route is explained by weather conditions. LNG-tanker Gaselys of the French company Engie, which carries a cargo of liquefied gas... were called. The company could not name the reasons for the reversal NOVATEK, at the factory " Yamal LNG» which this batch of gas was produced. “We sold this one... we need to ask the new owner - the Engie company,” a representative told RBC the day before NOVATEK. At the same time, experts interviewed by RBC did not rule out that... The first tanker with gas from Russia for the United States turned around in the middle of the Atlantic ... He. NOVATEK On December 5, he announced the launch of the first stage of the plant " Yamal LNG» for the production of liquefied natural gas with a capacity of 5.5 million tons LNG in year. ​ Until April 2018, gas from " Yamal LNG"will be sold on the spot market, after which deliveries under long-term contracts will begin. " Yamal LNG» 50.1% owned NOVATEK, 20... NOVATEK commented on gas supplies from Yamal LNG to the USA Representative NOVATEK commented to RBC information about the shipment of gas from “ Yamal LNG" in USA. "The first batch LNG from the factory " Yamal LNG» we sold Petronas and assumed that... the UK's first shipment of liquefied natural gas ( LNG) With " Yamal LNG" Kommersant also noted that the cargo LNG originally acquired the British branch of the Malaysian Petronas - Petronas.... Initially, the first batches of gas were supposed to be delivered to China. NOVATEK owns 50.1% " Yamal LNG", another 20% each belong to the French Total and the Chinese... NOVATEK announced plans to become a global player in the LNG market ... Russia by this time, according to forecast NOVATEK, more than 80 million tons will be produced LNG(besides " Yamal LNG» now liquefied gas is produced only at one... new LNG-factories NOVATEK estimates at 2.5–2.8 trillion rubles. (excluding " Yamal LNG") until 2030, and operating cash flow LNG-projects by this time, according to the company’s forecast, will reach 4–4.3 trillion rubles. NOVATEK ... NOVATEK intends to invest 700–780 billion rubles in gas assets. until 2030 ... first of all " Yamal LNG", located in Yamal. According to strategy NOVATEK, Russia will produce about 80 million tons by 2030 LNG, A NOVATEK will provide two... market LNG amounted to almost 30%). Before launch " Yamal LNG» Russia exported about 10 million tons LNG per year from the Sakhalin-2 plant of Gazprom. NOVATEK stated that it would be possible to reach the level of Qatar after the launch of two LNG-company projects: “ Yamal LNG" and "Arctic LNG-2". ​ Technological solution: why Russia needs LNG production in the Arctic ... NOVATEK, which is the key shareholder " Yamal LNG" The success is obvious. But the main thing is what next? Firstly, it is interesting and important what proportion of tankers with LNG... liquefaction LNG, but also Gazprom and NOVATEK are making efforts to create their own technologies and localize equipment production. It is assumed that the fourth line " Yamal LNG" will... NOVATEK named the buyer of the first gas shipment from Yamal LNG ... . This is stated in a message received by RBC NOVATEK, which owns 50.1% " Yamal LNG». NOVATEK on Tuesday, December 5, announced the launch of the first... in a message NOVATEK. Chairman of the Board and Co-Owner NOVATEK Leonid Mikhelson told reporters on December 8 that the first batches of liquefied gas of the project “ Yamal LNG» will be sent... to the list of the largest exporters LNG in the world,” Mikhelson noted (his words are quoted in the company’s message). Besides NOVATEK y " Yamal LNG» three more shareholders:... Gas benefits: how the state helped build Yamal LNG ...governments with export liberalization LNG. Initially, it was assumed that liquefied gas would be exported from “ Yamal LNG" will be Gazprom Export, with which NOVATEK in 2010 concluded... a supply contract under which the shareholders " Yamal LNG"could pledge loans. Soon after the long-awaited liberalization of exports LNG(November 2013) were introduced... The Saudi minister arrived at the opening of NOVATEK's Yamal LNG plant ... the village of Sabetta for the opening ceremony of the plant " Yamal LNG", controlled NOVATEK, and loading of the first batch of liquefied natural gas ( LNG) the Minister of Energy, Industry and Natural Resources arrived... in June, at the same time he met with the co-owner NOVATEK Leonid Mikhelson. Shareholders " Yamal LNG"besides NOVATEK(50.1%) are the French concern Total and the Chinese... ... from the project " Yamal LNG NOVATEK(controls 51% " Yamal LNGYamal LNG NOVATEK, shareholders " Yamal LNG The first tanker with Yamal LNG products will be sent to the Chinese CNPC ... from the project " Yamal LNG", which is scheduled to launch before the end of 2017, will be sent to China's CNPC, the CFO said NOVATEK(controls 51% " Yamal LNG") Mark Jetvey... the line of the plant " Yamal LNG» is 97% ready, the entire project as a whole is 89% ready, according to the company’s materials. Besides NOVATEK, shareholders " Yamal LNG"are French Total... The head of a company associated with the Yamal LNG project faces criminal charges ... « Yamal LNG", we remind you that he is building a plant for the production of liquefied natural gas in the Yamal-Nenets Autonomous Okrug ( LNG). The project provides for annual production of about 16.5 million tons LNG and... in 2017, 2018 and 2019, respectively. Shareholders of OJSC Yamal LNG" are PJSC " NOVATEK"(50.1%; co-owner and chairman of the board of the company Leonid Mikhelson... it was not possible to do this. Journalists also turned to " NOVATEK" And " Yamal LNG“, the answer has not yet been received. Workers warned the governor about a hunger strike due to non-payment of wages Employees of RSK-Logistic who worked on the construction of the project " Yamal LNG"(the largest shareholder of OJSC " Yamal LNG" company " NOVATEK"), informed the Governor of St. Petersburg Georgy Poltavchenko that... in 2017, 2018 and 2019, respectively. Shareholders of OJSC Yamal LNG" are PJSC " NOVATEK"(50.1%; co-owner and chairman of the board of the company Leonid Mikhelson... NOVATEKYamal LNG NOVATEK Yamal LNG LNG LNG NOVATEK ... The head of the FAS called the terms of the competition in Yamal “disgraceful” ...this region. These conditions apply only to NOVATEK building a gas liquefaction plant in Yamal " Yamal LNG", and its subsidiaries. “I don’t... 285.3 billion cubic meters. m (D1). NOVATEK is constructing a plant for the production of liquefied natural gas " Yamal LNG» with a capacity of 16.5 million tons in... others LNG-projects in Yamal and Gydan, for example, “Arctic LNG-2" on the basis of the Salmanovskoye and Geofizicheskoye fields. At the end of June, the CFO NOVATEK ... Yamal LNG", controlled NOVATEKYamal LNGYamal LNGYamal LNG"are NOVATEK (50 ... Yamal LNG will charter four gas carriers from a Japanese company ... . (MOL) signed a long-term contract for the charter of four gas carriers for the project " Yamal LNG", controlled NOVATEK. The tank capacity of each vessel will be 174 thousand cubic meters. m... Greek Dynagas. With these companies " Yamal LNG» signed 45-year transportation contracts. The first stage of the plant " Yamal LNG» with a capacity of 16.5 million tons should be launched at the end of 2017. The project is valued at $27 billion. Shareholders “ Yamal LNG"are NOVATEK (50 ... NOVATEKYamal LNGYamal LNG NOVATEK Yamal LNG will refuse €300 million of Chinese financing in favor of loans ... said the chairman of the board of the gas company “ NOVATEK» Leonid Mikhelson, reports RBC correspondent. Mikhelson confirmed that the first line " Yamal LNG"will be put into operation in... Germany, in the amount of about €300 million. " Yamal LNG» - a project for the production, liquefaction and supply of natural gas. NOVATEK plans to launch the first enterprise of the project... Company NOVATEK will involve in the project " Yamal LNG NOVATEK Yamal LNGYamal LNG» - a project for the production, liquefaction and supply of natural gas. NOVATEK Yamal LNG"at the end of 2017... NOVATEK will attract €200 million from Germany and Sweden to Yamal LNG Company NOVATEK will involve in the project " Yamal LNG» more than €200 million from financial institutions in Germany and Sweden. The head stated this NOVATEK Leonid Mikhelson, reports TASS. According to the agency, about attracting funds from Germany and Sweden to the project “ Yamal LNG“Mikhelson told... €200 million,” said Mikhelson. " Yamal LNG» - a project for the production, liquefaction and supply of natural gas. NOVATEK expects to launch the first plant " Yamal LNG"at the end of 2017... Novatek intends to attract Spaniards to projects in Yamal ... Novatek"does not rule out the possibility of attracting Spanish companies to the new project for the production of liquefied natural gas "Arctic LNG-2". The plant will appear on the shelf... business forum. With a number of foreign and Russian companies on the project “ Novatek"Already reached an agreement. In particular, a framework agreement on strategic... was signed. Start of construction LNG-the plant is planned for 2018, the launch of the first line (there will be three in total) - in 2022. Talking about " Yamal ...) - non-core business for NOVATEK, which focused on the development of large LNG-factories on Yamal and the Gydan Peninsula. First of all " Yamal LNG"with a capacity of 16.5 million... times, estimates the head of the department LNG ICIS Heren Roman Kazmin. LNG for Poland NOVATEK has already begun to develop in the small-tonnage market LNG, and Cryogas-Vysotsk can...

: Yar-Sale

Story

In May 2011, a competition for the basic design of the plant (English: front end engineering & design (FEED)), won by Chicago Bridge & Iron Company (CB&I). The project was supposed to be ready in the first quarter of 2012. In March 2013, NIPIgazpererabotka completed the adaptation of the basic design to Russian rules and regulations and developed a package of design documentation for the LNG plant to undergo state examination.

On September 17, 2012, Yamal LNG OJSC signed a license agreement with the chemical concern BASF on the use of BASF-owned natural gas purification technology at the projected plant. Oase».

In April 2013, Yamal LNG OJSC signed an agreement with Yamgaz SNC, a consortium of Technip (France) and JGC Corp. (Japan) for the design, supply of equipment, materials and components, construction and commissioning (EPC contract) of a complex for the treatment and liquefaction of natural gas based on the South Tambeyskoye field.

In September 2013, Yamal LNG OJSC entered into a contract with Siemens for the supply of elements of a thermal power plant, which should supply Yamal LNG with electricity and heat. Siemens was to manufacture, deliver, install and commission eight gas turbines and other equipment.

In October 2013, Yamgaz SNC chose the American General Electric as a supplier of the main turbocompressor equipment for three lines of the LNG plant. The contract amount is $600 million.

On December 18, 2013, NOVATEK announced that the Board of Directors of OJSC Yamal LNG accepted final investment decision(OIR) for the project. The implementation of the project involved, in addition to the construction of an LNG production plant, the creation of a transport infrastructure, including a seaport and an airport near the village of Sabetta, as well as a transshipment base in the Belgian Zeebrugge for the delivery of gas to the countries of the Asia-Pacific region during periods of lack of navigation along the Northern Sea Route. At the time of acceptance of the IIR, the main tenders were held within the project and key contracts were concluded. Orders were also placed for equipment with long lead times (cryogenic heat exchangers, gas turbines, compressors for liquefaction lines); The first 8 production wells were drilled. The site for the construction of the plant was prepared, the construction of a pile foundation for LNG tanks began, the construction of a seaport and airport began, and more than 70% of the LNG volumes planned for production were contracted.

In January 2014, Yamgaz SNC signed a contract with the French Vinci for the construction of four LNG storage facilities with a capacity of 160 thousand m³ each.

In January 2014, Yamgaz SNC entered into a contract with Japan's Yokogawa Electric to supply integrated control and safety systems (ICSS) for the project.

In July 2014, Yamgaz SNC entered into a contract with the Chinese Offshore Oil Engineering Co. (COOEC) for the manufacture of key gas liquefaction equipment worth $1.623 billion.

On April 27, 2016, the first two condensing modules weighing 1000 tons, manufactured by Wuchang Shipbuilding Industry - the largest and heaviest in the project - were sent from the Chinese port of Qingdao to the port of Sabetta on a special semi-submersible vessel. In total, 36 modules with a total weight of 180 thousand tons were built in Qingdao. The total weight of equipment for the plant is estimated at 650 thousand tons, of which 150 thousand tons are elements of overpasses (360 modules), and 500 thousand tons are technological modules (111 PC) .
On September 13, 2017, the last modules for the plant arrived.

By the time the first line was launched, to provide it with electricity, four of the eight planned SGT-800 gas turbine units with a capacity of 47 MW each, manufactured by Siemens, were put into operation at the power plant serving the project.

On November 29, 2017, Yamal LNG OJSC received state permission to commission the main technological facilities of the first stage of the LNG plant.

Investments in the project

At the time the management of Yamal LNG OJSC made the final investment decision (December 8, 2013), the capital investments of the project were estimated at 26.9 billion US dollars. Shareholder investments in the Project before the adoption of the IIR amounted to $2.6 billion.

Contracts for LNG supplies to Europe are based on pricing based, on the one hand, on the British trading platform National Balance Point, and on the other hand, on contract prices linked to the level of crude oil prices (Groningen principle). The contract with CNPC is tied to the so-called “Japanese Crude Cocktail” (JCC), and is calculated using the formula 12.67% × JCC + $0.26.

Fleet

On July 4, 2013, it became known that the competition for the production of sixteen ice-class LNG tankers to service the Yamal LNG project, in which seven leading shipyards in the world participated, was won by the Korean Daewoo Shipbuilding & Marine Engineering.

A slot reservation agreement was signed with this company, which includes options for construction, launching, equipment, equipment and delivery of Yamalmax class vessels, as well as establishing the preliminary cost of the vessels, the schedule for their production and delivery. The agreement provided for the transfer of the right to finance and purchase tankers to a third party - carrier companies selected by Yamal LNG. The fee for reserving shipbuilding capacity amounted to $5.6 billion.

On April 23, 2014, Yamal LNG OJSC published a shortlist of shipping companies that will service the LNG production plant. It included Sovcomflot, Mitsui and Teekay LNG. Each of the companies had to build a fleet for transporting gas: Sovcomflot - six ships, Mitsui - four, TeekayLNG - six. The cost of one vessel is about $340 million ($5.5 billion for all 16 LNG tankers).

In August 2015, due to the fact that Sovcomflot had difficulties with financing, Yamal LNG subsidiary Yamal Trade Singapore assigned the rights to five of the six LNG tankers previously intended for Sovcomflot to a Greek shipping company Dynagas. The transaction amount was $1.5 billion. At the same time, long-term charter agreements for these tankers were signed.

The first vessel of the series, the gas carrier Christophe de Margerie, was built in March 2017 and delivered to Sovcomflot. By January 2018, the fleet approved to work with Yamal LNG was replenished with three more vessels: Boris Vilkitsky, Fedor Litke (both owned by the Greek Dynagas) and Eduard Toll, owned by the Canadian Teekay.

Owners

In June 2005, a blocking stake in Tambeyneftegaz LLC (25.1%) was sold by NOVATEK to a subsidiary of Gazprombank - Gazprombank-invest LLC.

In July 2005, the license was reissued to Yamal LNG OJSC, created on April 7, 2005, in which Tambeyneftegaz owned 51%, and the British Tambeigas Holdings Ltd, controlled by Nikolai Bogachev, owned 49%. The Gazprom group initiated legal investigations into the illegality of re-issuing the license, and Bogachev began negotiations on the sale of the business.

In November 2006, Bogachev sold Tambeyneftegaz LLC and Yamal LNG OJSC. Gazprombank-Invest bought 25% plus one share of Yamal LNG OJSC for $5 million. The remaining shares (75% minus one share of Yamal LNG OJSC and Tambeyneftegaz) were purchased by Alisher Usmanov’s structures for $350–360 million.

In May 2009, 51% of the shares of Yamal LNG OJSC were purchased from Timchenko's structures of NOVATEK OJSC for $650 million and 13.13% of the shares of NOVATEK.

In July 2010, NOVATEK became the owner of 100% of the shares of Tambeyneftegaz LLC. The transaction amount was $10 million (In October 2014, Tambeyneftegaz LLC was liquidated).

In September 2011, NOVATEK's share in the authorized capital of Yamal LNG JSC was increased to 100%, but already in October it was reduced to 80% as a result of the sale of a 20% share to Total.

In September 2013, NOVATEK and CNPC signed a binding agreement on the entry of the Chinese company into the project through the sale of 20% of Yamal LNG to CNPC.

In November 2013, information appeared in the media that in the future NOVATEK plans to retain only a controlling stake in the project, and divide the remaining 10% - 1 share between consortiums of Japanese and Indian companies.

In January 2014, NOVATEK closed a deal to sell 20% of Yamal LNG OJSC to a CNPC subsidiary, CNODC. The transaction amount was not disclosed, but according to media reports, the value of the package as of September 2013 was $1 billion.

In December 2015, NOVATEK and the Chinese Silk Road Fund Co Ltd. (SRF) signed a purchase and sale agreement for a 9.9% stake in the Yamal LNG project.

see also

Notes

  1. Evgeny Kot became the General Director of Yamal LNG (undefined) . Gazeta.Ru(September 23, 2014).
  2. https://disclosure.1prime.ru/portal/default.aspx?emId=7709602713
  3. Putzmeister Rus. YAMAL LNG (2015 -2016).mov (undefined) (April 22, 2016). Retrieved December 26, 2017.
  4. comprehensive plan for the development of liquefied natural gas production in Yamal (Russian). Russian newspaper. Retrieved December 20, 2017.
  5. Government of the Russian Federation. comprehensive plan for the development of liquefied natural gas production on the Yamal Peninsula (undefined) (October 11, 2010).
  6. CB&I wins FEED contract for Yamal LNG project in Russia - Energy Business Review (undefined) . transportationandstorage.energy-business-review.com. Retrieved December 20, 2017.
  7. NIPIgazpererabotka received high praise from CB&I for its design work for Yamal LNG (undefined) . www.nipigas.ru. Retrieved December 20, 2017.
  8. OJSC "Yamal LNG". (undefined) (17.09.2012).
  9. The main gas project in Yamal will receive a transshipment base in Europe
  10. (Russian) . Retrieved December 23, 2017.
  11. The launch is getting closer. The last 2 modules for the Yamal LNG plant arrived at the port of Sabetta. Retrieved December 23, 2017.
  12. Yamal LNG produced the first volume of liquefied natural gas (Russian) TEKNOBLOG(November 9, 2017). Retrieved December 23, 2017.
  13. Mechanical engineering portal. The Yamal LNG plant shipped the first batch of liquefied natural gas - Mechanical Engineering Portal (Russian). mashportal.ru. Retrieved December 22, 2017.
  14. Yamal LNG project. Project for the construction of a power plant necessary to ensure the operation of the plant as part of the Yamal LNG project (Russian). energokaskad.ru. Retrieved December 22, 2017.
  15. Novatek has been given a launch date for the Yamal LNG plant - SeaNews (Russian). seanews.ru. Retrieved December 29, 2017.
  16. V. Putin in Yamal. The Yamal LNG plant shipped the 1st batch of liquefied natural gas
  17. The first batch of LNG from the Yamal LNG project has been sent to the UK
  18. The port of Sabetta received the first LNG tanker
  19. China has created serious problems for Gazprom in Europe // Vzglyad, February 7, 2019
  20. The unexpected growth of GDP in 2018 was explained by the construction of Yamal LNG // Interfax.
  21. PAO NOVATEK Press center: Press releases and events | The final investment decision has been made on the Yamal LNG project (undefined) . www.novatek.ru. Retrieved December 20, 2017.
  22. ntv.ru. The volume of investments in Yamal LNG reached $15 billion(English) . NTV. Retrieved December 22, 2017.
  23. Yamal LNG received the 2nd tranche from the National Welfare Fund of Russia (Russian). Retrieved December 22, 2017.
  24. We don’t know how and we don’t learn (Russian)(July 7, 2014). Retrieved July 16, 2014.

I read the material of the respected Brekotin today .

As always, there are citizens for whom the construction of a new Russian enterprise is like a knife to the heart.

And Russia doesn’t need construction, and the investments are wrong, and the workers are wrong, and the equipment is wrong, and the buyers are bastards, everything, without a doubt. Well, God is their judge. This is their fate - to criticize, sitting in a warm apartment, without lifting their butts from the sagging sofa.

And for normal people, I suggest you look: what is Yamal LNG- In fact. So: look and rejoice for our heroic builders and the capabilities of Russian industry.

The whole truth about Yamal LNG

I was again drawn to the north, far, far away, beyond the Arctic Circle, to the Yamal Peninsula in Sabetta, where one of the largest projects in the oil and gas sector in recent years is being implemented - Yamal LNG. To understand, $22 billion has already been invested in it (a total of about $27 billion is planned). The liquefied natural gas (LNG) plant itself will operate on the resource base of the South Tambeyskoye field, and its capacity will be 16.5 million tons per year. Last May I was already in these parts http://zavodfoto.livejournal.com/4827701.html, then the overall readiness for the entire project was about 51.3%, and the readiness for the first stage was 64.4%. How things are today, I will show and tell you everything, fortunately the company PJSC NOVATEK, a shareholder of the project, is very open in this matter and is not afraid of me :).

2. Experienced a moment of deja vu. The speaker this time was Dmitry Monakov, already familiar to me, the first deputy director of the project.

3. And straight to the numbers. At the moment, the overall readiness for the entire project is 77-78%, and for the first stage of the plant it is already 88%. This is, in fact, what the first phase should look like by the end of the year.

The South Tambeyskoye field is located in the North-East of the Yamal Peninsula and belongs to the West Siberian oil and gas province. It was opened back in 1974. The field consists of 5 shallow gas formations and 37 deep gas condensate formations. The depth of the deposits varies from 900 to 2850 m. The dimensions of the deposit from south to north are about 70 km and from east to west - about 30-35 km. In total, they plan to drill 208 production wells with a horizontal end at 19 well pads at the field (the required 58 wells have already been drilled for the first stage, and a total of 78 have already been drilled at the moment. At the same time, only 35 wells are needed for the second stage, and about 35 for the third stage as well -38. The rest will have to maintain the necessary flow rate for the full operation of the plant). Proven and probable reserves amount to about 1.3 trillion cubic meters of gas and 60 million tons of condensate. The license to develop the field belongs to the Yamal LNG company and is valid until 2045. This resource base should be enough for at least 25-30 years of confident work.

The Yamal LNG plant will consist of three gas liquefaction trains with a capacity of 5.5 million tons per year each, i.e. the total capacity will be 16.5 million tons. In addition, the production complex will include liquefied hydrocarbon gas fractionation units, stable condensate and refrigerant storage parks, as well as other general plant engineering systems and flare units.

The entire plant will be built from 360 modules, of which there will be 111 technological modules. The first such module was delivered to the construction site on September 21, 2015. This core equipment is produced in 7 Chinese and 3 Indonesian shipyards. The total weight of the LNG plant is 650 thousand tons, of which 150 thousand tons are racks, and 500 thousand tons are the process modules themselves.

In the fall of 2016, all 78 modules required for the first stage, including the central control room, were delivered to Sabetta. Nevertheless, there are still 57 modules left to be delivered to the plant’s territory (for the second and third stages), which will appear here according to plan before the end of 2017.

8. On this day it was minus 30 here, and there was still a very strong wind at the altitude, but how could this stop me, who is in love with our industry? Therefore, almost blindly, since all my glasses are fogged up and frozen, I conquer and conquer all the lush heights of the plant :-)

9. Yes, well, in a year we’ve done a lot of business here, we’ve built a lot of things, well done, keep it up, we’ve definitely surprised!

11. We didn’t feel shy, we walked around inside...

The start of LNG production on the first line is planned for 2017, while the first deliveries of liquefied natural gas from here should take place before the end of this year.

16.Tanks for storing liquefied gas, there are four of them in total (4x160,000 m3). In permafrost conditions, each tank is built on a foundation of 948 piles, each 24 meters deep, with a thermal stabilizer installed next to each. In 2016, all of them were built and passed the necessary hydrotests. The main platforms of pumping equipment are installed on the first two tanks.

18. We climbed to one of the reservoirs. Their height is 54 meters. By the way, last year I was inside it, but now the way there is already closed.

20. An important component of the project is its own generation. A new gas turbine power plant with a capacity of 376 MW will be built here, the thermal power plant will be 160.0 MW. You see, on the right you can see an orange, blue and white building with pipes, that’s it. The first gas turbine with a capacity of 47 MW should be launched this spring. Thus, it will create the energy foundation for launching the first stage of the plant. It’s no secret that I’m partial to energy, so I’ll write a separate post about it.

As for the production process, it can be briefly described as follows. From the wells, gas is transported to the plant through a pipeline system. They are above ground here. When the gas enters the LNG plant, it is lightly conditioned to ensure the best possible liquefaction process. To do this, condensate is separated from the gas (these are liquid fractions that are simply dissolved in the gas at formation pressure and are in a state like steam), methanol (used for production, such as lubricant) and other unnecessary impurities. By the way, condensate also remains in use; it goes through a pipeline system into special tanks (there are 3 tanks of 50,000 m3 each for this purpose) and when a special tanker arrives, it is also shipped to consumers. Clean (prepared) ideally dry gas is supplied for liquefaction and then stored in tanks. In addition, in order to obtain a high-quality final product, carbon dioxide and mercury released during the cleaning process are removed.

On November 13, 2016, cryogenic heat exchangers were delivered to Sabbeta for the second and third lines of the plant, but for the first line, a similar heat exchanger has already been installed in the right place. The main cryogenic heat exchanger is considered the “heart” of the LNG plant, because it is inside it that the final cooling of natural gas to a liquid state is carried out. The heat exchanger itself is made of aluminum alloy and consists of several tube bundles wound onto a central core. The total length of the pipes exceeds 43 km.

35. Currently, about 27,500 people work at the construction site.

40. Our next stop is the Arctic sea port, which is also part of the general infrastructure of the plant. I also wrote about him last time: http://zavodfoto.livejournal.com/4838728.html

41. By the way, thanks to Yamal LNG, cargo traffic along the Northern Sea Route has doubled. And in total, more than 10 million tons of cargo have already been delivered to the seaport of Sabetta since 2012.

The Yamal LNG project: a significant event of recent years, comparable in scale and prospects, perhaps, to the development of Western Siberia half a century ago

 

Reference Information:

  • Name: Gas liquefaction plant "Yamal LNG".
  • Purpose of the object: production of liquefied natural gas.
  • Start of construction: year 2012.
  • Completion: 2019
  • Object cost:$27 billion.
  • Who is building (main general contractor/beneficiary): PJSC NOVATEK/L. Mikhelson.

The shift camp beyond the Arctic Circle called Sabetta, on the shores of the Yamal Peninsula, is far from a resort. And although planes fly here quite often, and the airport itself will be better than in many large cities of Russia, you cannot buy tickets. People come here for work and shifts. Only KamAZ can safely travel from the air harbor to the village where workers of the Yamal LNG liquefaction plant live, which is near the village of Sabetta, and the huge torch next to the plant is today considered a local landmark. Its power melts the snow in the area, and the howl of the flame is simply deafening.

Just a few years ago, Sabetta became part of the Northern Sea Route. The seaport here was built as part of a public-private partnership. Nuclear icebreakers of Rosatomflot make it possible to service the sea route in the Far North. And this makes it possible to deliver cargo to the port all year round. In winter, icebreaker assistance is used. This port is one of the most important supporting points of the Northern Sea Route, the shortest route connecting Europe and Asia. It is destined to become the main base for the development of Yamal fields and provide year-round navigation along the Northern Sea Route.

Rice. 1. Integrated project for the production, liquefaction and supply of natural gas
Source: website lightproduction.ru

Subtotals

But at the beginning of December 2017, almost all news agencies wrote about this small village. It was here that the President of the Russian Federation arrived with distinguished guests, including:

  • Khalid Al Falih, Minister of Energy of Saudi Arabia;
  • Patrick Pouyanné, President, Chairman of the Board of Directors of the energy company Total;
  • Wang Yanzhi, General Manager of the Silk Road Foundation;

    The “Silk Road” reached to the very north. Let's combine it with the Northern Sea Route, and we will have what we need. And we will make the Northern Sea Route silk” (V. Putin).

  • Saudi Aramco, chief director of the most powerful national Saudi oil company.

Distinguished guests are invited to attend the loading ceremony of the tanker Christophe de Margerie - the first merchant ship in the world to sail to these places without icebreaker assistance.

“Without the participation and trust of foreign partners, this project would not have taken place. And he himself is named after our friend de Margerie (the president of Total who died in October 2014). It’s a pity that he is not with us today” (V. Putin).

On this day, the first batch of liquefied gas was loaded onto the tanker from Yamal LNG. Not everyone believed in the project. But there were people who were not afraid to take risks and proved to the whole world that this risk was justified.

A large delegation visited Yamal LNG, a world-class plant, the first enterprise of this level built in the Arctic. 15 countries and hundreds of domestic enterprises are involved in its construction. This construction will cost $27 billion.

It's no secret that strategic Russian oil and gas companies are subject to sanctions. But even inclusion in Western sanctions lists did not become an obstacle for the main shareholder of PJSC Novatek in attracting external financing. The first phase of the project was completed on time, and this under such tough conditions. Moreover, and this is especially valuable, the initial estimated cost has not been exceeded.

But this was just the beginning.

Yamal LNG project

It is being implemented on the basis of the South Tambey gas field, the proven and probable reserves of which are estimated at 1.3 trillion cubic meters. meters of gas and 60 million tons of condensate. The license of the Yamal LNG company to develop the field is valid until 2045. Having such a resource base means having a guarantee of reliable work for at least 25-30 years.

“About 14 thousand people will be employed during the construction of the plant, and after its completion in 2018, 1 thousand 400 jobs will be created at the enterprise” (Igor Kholmanskikh, Plenipotentiary Representative of the President of the Russian Federation in the Urals Federal District).

Provides for the production of 16.5 million tons of LNG per year and up to 1.2 million tons of gas condensate. Deliveries of the finished product are planned to the European markets and mainly to the countries of the Asia-Pacific region, new for Russian gas.

Rice. 2. Yamal LNG plant
Source: website geostarspb.ru

The entire plant will be built from 360 modules, of which 111 are technological. This equipment is produced at seven Chinese and three Indonesian shipyards.

The launch of the first line took place in December 2017, when the first tanker with LNG was shipped. Currently, two million tons of LNG have been shipped from the first stage of the plant.

Yamal LNG has shipped the second million tons of LNG from the first stage of the plant. Gas supplies have been carried out since December last year by Arctic gas carriers of the Arc-7 class with a capacity of about 74 thousand tons. The two millionth ton was shipped in 27 batches. In April 2018, LNG supplies began under long-term contracts, under which 4 shipments have already been shipped. In April, the first ignition of gas turbines of compressors of the second stage of the plant with a capacity of 5.5 million tons was also carried out, which is one of the most important stages in preparing the line for launch” (company message on May 7, 2018).

The project provides for the construction of the necessary transport and social infrastructure in order to ensure efficient and safe operation of the project.

The second (in 2018) and third (in 2019) phases are to be launched. The total volume of investments for all phases I-III of the complex is $27 billion.

“I think that the second line will be introduced three months earlier [than plan] and the third line will be introduced 6-9 months earlier” (Leonid Mikhelson, Chairman of the Board of NOVATEK).

How Yamal LNG OJSC began

The gas reserves explored in Yamal and adjacent territories bring this region to a leading position in Russia. Today, Yamal contains more than 20% of Russian gas, so local fields are the main area for the production of “blue” fuel.

The joint stock company was created more than ten years ago. Its shareholders were Novatek with 60% of shares, Total with 20% and CNPC also with 20% of shares. Recently, the Silk Road Fund joined the shareholders, after which Novatek sold it a 9.9% stake, retaining a controlling stake.

In 2012, the main construction began. The approach to it was implemented in a comprehensive manner. The first shift workers in Sabetta, then a tiny and unknown settlement of the Nenets, appeared in 1980. But only with the development of a large-scale project did the village receive development, and now world fame.

Construction began on a seaport, a gas liquefaction plant, a modern Sabetta airport and the village of Sabetta itself, the population of which increased to 20,000 people.

Gas is supplied to the plant from wells through pipes laid above the ground. There, gas condensate, methanol and other foreign fractions are separated from it. The perfectly dry gas obtained as a result of purification is sent for liquefaction, and from there through pipes to storage tanks. There are four of them, each with 160 thousand cubic meters. meters. They were built in 2016 in permafrost conditions. At the base of each are 948 piles, each 24 meters deep. They passed all the necessary hydrotests.

  • Seaport of the Yamal LNG company.

    The Sabetta seaport was built specifically for the shipment of liquefied gas. The port of the Yamal LNG company has become the gateway to the Arctic and a key link in the construction of the plant. Moreover, not only liquefied natural gas, but also other cargo will be transported through it along the Northern Sea Route.